• chiliedogg@lemmy.world
    link
    fedilink
    English
    arrow-up
    0
    arrow-down
    1
    ·
    edit-2
    1 month ago

    So only 4000 miles of grade-separated high-speed rail (and all the infrastructure and private property easements, divisions, etc required for the construction) just to connect just these 2 cities? No problem.

    • Alaknár@sopuli.xyz
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 month ago

      You don’t connect just those two cities, mate. You connect them as the main artery and then do split-offs to other areas. Or, even better, you weave the main railway between major cities East-to-West to connect them directly.